Preliminary Design Report Appendices Downloads

Volume 1

  • 1.A DUSEL Comprehensive Organization Chart as of December 31, 2010

Volume 2 (Available on request)

  • 2.A DUSEL Cost Book
  • 2.B McCarthy Kiewit 100% Preliminary Design Phase Deliverables
  • 2.C Underground Infrastructure Design—Construction Cost, Schedule, Procurement Strategy, 100% Preliminary Design
  • 2.D Underground Laboratory Design—Construction Cost, Schedule, Procurement Strategy, 100% Preliminary Design
  • 2.E Cost Estimate, Preliminary Design Report—Final DUSEL Excavation and Design Services Contract
  • 2.F Construction Cost Estimate - Final Report, Phase I (30%) Preliminary Design Report (PDR) Surface Facilities and Campus Infrastructure
  • 2.G McCarthy Kiewit 7400L Conceptual Design Deliverables
  • 2.H Underground Infrastructure 7400L Conceptual Design Report – Construction Cost, Schedule, Procurement Strategy
  • 2.I Underground Laboratory 7400L Conceptual Design Report – Construction Cost, Schedule, Procurement Strategy
  • 2.J Cost Estimate, 7400 Level Conceptual Design Report for Excavation
  • 2.K Consolidated Management Reserve Calculation Worksheet
  • 2.L DUSEL Integrated Project Schedule
  • 2.M Staffing Description

Volume 4

  • 4.A Education Governing Board (EGB) Charter
  • 4.B Education Advisory Committee (EAC) Charter
  • 4.C Cultural Advisory Committee (CAC) Charter
  • 4.D Statement of Sanford Center for Science Education (SCSE) Mission, Vision, Goals, Objectives, Core Values, and Functions
  • 4.E Market Assessment & Analysis Report
  • 4.F Sanford Center for Science Education (SCSE) Essential Elements Document
  • 4.G Community Input on Facility Design Principles
  • 4.H Underground Experience as Education Requirement
  • 4.I Content Development Report

Volume 5

  • 5.A Overview of the Facility Design Scopes
  • 5.B DUSEL Long Range Development Plan (LRDP)
  • 5.C DUSEL Facility ADA Policy
  • 5.D Final Report, Phase 1 (30%) Preliminary Design Report (PDR) Surface Facilities and Campus Infrastructure
  • 5.E Phase I Report, Site Assessment for Surface Facilities and Campus Infrastructure to Support Laboratory Construction and Operations
  • 5.F Phase 2 Final Report, Phase II Site and Surface Facility Assessment Project Report
  • 5.G Phase II Roof Framing Assessment
  • 5.H Geotechnical Engineering Summary Report
  • 5.I PDR Final Report, DUSEL Excavation and Design Services Contract
  • 5.J Geological and Geotechnical Assessment Report
  • 5.K Basis of Estimate (BOE), Option B
  • 5.L DUSEL Underground Infrastructure Design, UGI Basis of Design Report, 100% PDR
  • 5.M Preliminary Infrastructure Assessment Report
  • 5.N Technical Memorandum, Waste Rock Geochemical Analysis
  • 5.O DUSEL Underground Infrastructure Design, Preliminary Design, 100% PDR
  • 5.P DUSEL Systems Integration Plan (SIP)
  • 5.Q DUSEL Underground Laboratory Design, Basis of Design Report, 100% PDR
  • 5.R DUSEL Underground Laboratory Design, Preliminary Design Documents, 100% PDR
  • 5.S DUSEL Underground Laboratory 7400 Level, Conceptual Design Report, FINAL
  • 5.T DUSEL Underground Infrastructure 7400 Level, Conceptual Design Report, FINAL
  • 5.U 7400L Conceptual Design

Volume 6

  • 6.A Integrated Safety Management System (ISMS) Policy
  • 6.B EH&S Manual Quick Links
  • 6.C Preliminary Hazard Analysis (PHA)
  • 6.D EH&S Standards for DUSEL/Sanford Laboratory
  • 6.E Third Party Review Letter of the Fire and Life Safety (FLS) Design for DUSEL

Volume 7

  • 7.A DUSEL Work Breakdown Structure (WBS) Dictionary
  • 7.B DUSEL Configuration Control Board (CCB) Charter
  • 7.C DUSEL Quality Assurance Policy
  • 7.D DUSEL Quality Assurance Surveillance Plan (QASP)

Volume 8

  • 8.A DUSEL Resource Breakdown Structure (RBS)
  • 8.B DUSEL Responsibility Assignment Matrix (RAM)

Volume 9

  • 9.A Systems Engineering Management Plan, Draft
  • 9.B Requirements Compliance Matrix
  • 9.C Risk Management Plan
  • 9.D Configuration Management Plan
  • 9.E DUSEL Project Requirements Document
  • 9.F Integrated Suite of Experiments Interface Requirements Document
  • 9.G Facility Infrastructure Requirements Document
  • 9.H Facility Spaces Requirements Document
  • 9.I DUSEL Facility Requirements Document
  • 9.J Operations Concept Document
  • 9.K External Interface Requirements Document
  • 9.L Requirements Management Plan
  • 9.M Trade Study 385: Emergency Escape, Secondary Egress
  • 9.N Trade Study 418: 31 Exhaust vs. New Raise Bore
  • 9.O Trade Study 379: Waste Rock Disposal
  • 9.P Trade Study 422: Shaft Pipe Connections
  • 9.Q Trade Study 2: Yates Head Frame Reinforcement
  • 9.R Trade Study 408: LMD-1 (7400L Lab Module 1) Size and Configuration Options
  • 9.S Trade Study 374: Evaluation of Alternative Shapes of Large Cavities
  • 9.T Trade Study 323: Ventilation and Utilities Drift
  • 9.U Trade Study 394: Purified Water Routing to Experiments other than LBNE
  • 9.V Trade Study 380: Central Utility Plant
  • 9.W Trade Study 369: Crane Configurations in Lab Modules
  • 9.X Trade Study 1: Spacing of Yates Steel Sets
  • 9.Y Trade Study 377: UG Mobile Vehicle Type
  • 9.Z Trade Study 409: LM1 (Lab Module 1) Modifications for DIANA
  • 9.AA Trade Study 368: LM2 (Lab Module 2) Size and Configuration Options
  • 9.AB Value Engineering Management Plan
  • 9.AC Preliminary Design Value Engineering Items
  • 9.AD DUSEL Program Risk Register PDR Summary

 

The DUSEL plan